| Job Highlights | Page: 1 2 3 |
Overall design plan of the LUHS 14,400 gallon per day Wastewater System.
LUHS wastewater field under construction and before pressure test.
Testing disposal fields.
LUHS wastewater field pressure test.
Completed Lamoille Union High School wastewater disposal Control Building with disposal fields in the background being used as ball fields.
